Please enable Javascript to experience full features

TOYO Pump Selection

DATA REQUIRED FOR TOYO PUMP SELECTION:

Site Information:
Purpose
   
 
COMPOSITION OF MATERIAL TO BE PUMPED:
Material % FREE SOFT STICKY Hardness (Pl. Specify NPT in 'N')
Mud/Silt
Clay
Sand
Gravel
Average Solid Size:
Minimum (mm) Maximum (mm) Percentage Remarks
0.01 1.0
1.0 2.0
Average Sp. Gr. Material :
Total Solids to be pumped : M3
Time for the operation : No. of Days
Power Source available :
V HZ PH
Piping Configuration

Toyo Piping Configuration
A. Maximum Height of Pipe Line above water level (mtrs):
B. Horizontal distance (mtrs):
C. Water Depth (mtrs):
D. Dredging Depth (mtrs):
E. Distance to be dredged:
  Length :
  Breath :
  Total Dredging Depth (C+D) :
Contact Details:
Name : Designation :
Organization : Tel. :
Mob. : Email :
Message :      

 

 

^